Weber County Cities
Farr West Harrisville Hooper Huntsville North Ogden Ogden
Riverdale Roy South Ogden Washington Terrace West Haven
NOTE: We are still in the process of posting all of the building permit information for all of the cities listed above.
If your city's information is not shown here, we recommend contacting your local city office for more information.
Farr West
Farr West City Storage Shed Building Permit Requirements:
The Farr West City website does not have any specific information about what sizes of sheds require a building permit. However, most cities in Weber County have adapted the International Building Code which states that any buildings 200 sq. ft. and smaller do not require a building permit.
We have not been able to verify this and we recommend contacting Farr West City. 801-731-4187
More information will be coming soon...
The above information is informational only and does not replace official city documents.
Harrisville
Harrisville City Storage Shed Building Permit Requirements:
The Harrisville City website does not have any specific information about what sizes of sheds require a building permit. However, most cities in Weber County have adapted the International Building Code which states that any buildings 200 sq. ft. and smaller do not require a building permit.
We have not been able to verify this and we recommend contacting the Harrisville City Offices. 801-782-4100
If you have any additional information about building permit requirements in Harrisville please call us and let us know.
More information will be coming soon...
The above information is informational only and does not replace official city documents.
Hooper
Hooper City Storage Shed Building Permit Requirements:
Hooper City does not require a building permit for any detached storage shed or similar structure that is 200 sq. ft. or smaller. However, these sheds do require a site plan approval showing that all setback requirements are being met. Buildings larger than 200 sq. ft. do require a building permit.
This information has been verified on the Hooper City Building Permits web page.
Below is an excerpt from the section of the website about when a building permit is required.
A Building Permit is REQUIRED for the following:
If you have any other questions about building permits please contact the
Hooper City Building Department.
5580 West 4600 South
Hooper, Utah 84315
801-732-1064
The above information is informational only and does not replace official city documents.
Huntsville
Huntsville City Storage Shed Building Permit Requirements:
Huntsville does not require a building permit for any detached sheds or accessory structures that are 200 sq. ft. or smaller. However they may need planning commission approval to ensure that you are meeting the correct setback requirements.
All buildings larger than 200 sq. ft. will require a building permit.
This information has been verified on the "WHEN DO I NEED A PERMIT" handout on the city's website.
Below is an excerpt from that handout:
WHEN DO I NEED A PERMIT?
If you have any questions about building permits, please contact the
Huntsville Building Department
801-745-1792
The above information is informational only and does not replace official city documents.
North Ogden
North Ogden City Storage Shed Building Permit Requirements:
The North Ogden Building Dept. web page does not specifically state what sizes of sheds require a building permit; however, it does state that they have adopted the International Building Code which states that any buildings 200 sq. ft. and smaller do not require a building permit. Some cities will require a permit to ensure that all setback and zoning regulations are being met but we have not been able to verify exactly what North Ogden's requirements. are. If you have any information about this. please let us know so we can update our website.
More information will be coming soon...
If you have any other questions about building permits please contact the
North Ogden Building Department
801-737-2214
The above information is informational only and does not replace official city documents.
Ogden
Ogden City Storage Shed Building Permit Requirements:
The Ogden City website does not have any specific information about what sizes of sheds require a building permit. However, most cities in Weber County have adapted the International Building Code which states that any buildings 200 sq. ft. and smaller do not require a building permit.
We have not been able to verify this and we recommend contacting the Ogden Building Department 801-629-8000
More information will be coming soon...
The above information is informational only and does not replace official city documents.
Riverdale
Riverdale City Storage Shed Building Permit Requirements:
Riverdale does not require a building permit for any sheds that are 200 sq. ft or smaller unless it has plumbing or electrical.
All buildings larger than 200 sq. ft. will require a building permit.
This information has been verified on the Riverdale Building permits frequently asked questions web page.
Below is an excerpt from that web page:
SHEDS / ACCESSORY BUILDING
Q Is a permit required to build a shed in Riverdale City?
A Yes and No. If a permit is required, A fee based on the valuation of the structure will be assessed.
Typically, a shed that is 200 square feet or less does not require a building permit unless some type of electrical or plumbing work will be completed. A shed that exceeds 200 square feet requires a building permit.
THINGS TO REMEMBER ABOUT SHEDS
1) A shed is considered an “Accessory Building” and accessory buildings have limitations in a residential zone. An accessory building cannot exceed twenty (20) feet in height nor can it be greater than 1,000 square feet in area. In addition, an accessory building or group of accessory buildings cannot cover more than twenty-five percent of your rear yard.
2) When an accessory building (shed) is detached from the main building (your house), and the accessory building is located at least six (6) feet behind the main building, then the rear yard set back for the accessory building may be no less than one (1) foot from the property line.
Simply put, the shed can be one foot off your property line if it is at least six (6) feet behind your house. WITH ONE EXCEPTION, IF THERE ARE UTILITY EASEMENTS. If the shed is not six (6) feet behind your house, the shed will have to meet the minimum side yard setback requirements for its designated zoning, which is typically eight (8) feet.
3) Utility easements are generally anywhere from five to ten feet and can be located almost anywhere on your property. Yes, it is still your property; however, utility companies have rights to that portion of your property. Permanent structures cannot be built in a utility easement. If you plan to build some type of shed or accessory building on your property, please contact the Community Development department at 801-394-5541 ext. 1216 to determine the size and location of the utility easements on your property.
If you have any other questions about building permits please contact the
Riverdale Building Department
Address:
4600 South Weber River Drive
Riverdale City, Utah 84405
Phone:
(801) 394-5541 ext. 1215
The above information is informational only and does not replace official city documents.
Roy
Roy City Storage Shed Building Permit Requirements:
Roy City does not require a building permit for any storage sheds or other outbuildings that are 200 sq. ft. and smaller and are not taller than 10 ft.
This information has been verified on the Roy City Building Permits and Inspections web page.
Below is an excerpt from that web page:
Do I need a building permit?
Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit.
A building permit is NOT required for the following:
Accessory buildings with a maximum height of 10 feet and a maximum size of 200 square feet shall not require a building permit, provided all setback requirements for the zone in which the accessory building is located are met, no portion of the accessory building extends over any property line, and no storm water runoff from the accessory building is allowed to run onto the adjacent property. A no-fee application and review is required for all accessory buildings to establish compliance with the setback and runoff requirements.
Fences not over six feet high.
Retaining walls that are not over four feet in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge.
If you have any other questions about building permits please contact the
Roy City Building Department
801-774-1031
The above information is informational only and does not replace official city documents.
South Ogden
South Ogden City Storage Shed Building Permit Requirements:
The City of South Ogden requires a building permit for all storage shed larger than 120 sq. ft. There are other guidelines that govern shed placement that will be noted below.
This information has been verified on the South Ogden Building Permit Inspections web page.
Below is an excerpt from that web page:
Q: Is a permit required to build a shed in South Ogden City?
A: Yes. A permit is required for sheds larger than 120 sq. ft. Sheds 120 sq. ft. or less do not require a permit, however, the following guidelines must be adhered to. Any shed found to be in non-compliance may be required to be removed. Also note that any shed built over a utility easement without written permission from the utility companies is also subject to removal.
ACCESSORY BUILDING (SHED) GUIDELINES
If you have any other questions about building permits please contact the
South Ogden Building Departments
Location: 3950 S Adams Ave
Phone: (801) 622-2913 Fax: (801) 622-2902
The above information is informational only and does not replace official city documents.
Washington Terrace
Washington Terrace City Storage Shed Building Permit Requirements:
Washington Terrace Does not require a building permit for sheds that are 200 sq. ft. or smaller; However, a zoning compliance permit will be required for these buildings. There is not a charge for these permits and they can be picked up at the city office. More information on this will be shown below.
This information has been verified on the city's Accessory Buildings (Shed) information sheet.
Below is an excerpt from that sheet.
ACCESSORY BUILDINGS SHED INFORMATION SHEET
HEIGHT 6 foot minimum may not exceed height of the main building on the lot or
25 feet
FLOOR AREA A Zoning Compliance Permit is required for ashed under to square
feet roof area There is no charge for this permit and the form can be picked up in the
Community Development Department Sheds or other accessory buildings over OD
square feet roof area will require a site plan to submit to the building department for
approval
PLACEMENT ON LOT Sheds and other accessory buildings must be 6 feet from the
rear of the main building at least b feet from the dwelling on adjacent lots and 1 ft.
from property lines On comer lots sheds and accessory buildings must not be
constructed in the site triangle C foot from the comer intersection of lot lines All sheds
should be placed anchored and placed on a concrete slab
If you have any other questions about building permits please contact the
Washington Terrace Building Department.
Phone: 801-395-8288
The above information is informational only and does not replace official city documents.
West Haven
West Haven City Storage Shed Building Permit Requirements:
The West Haven City website does not have any specific information about what sizes of sheds require a building permit. However, most cities in Weber County have adapted the International Building Code which states that any buildings 200 sq. ft. and smaller do not require a building permit.
We have not been able to verify this and we recommend contacting the West Haven Planning Department. Contact information is shown below.
More information will be coming soon...
If you have any other questions about building permits please contact the
West Haven Planning Department.
Phone: 801-731-4519
The above information is informational only and does not replace official city documents.
Thank you for visiting the Apex Shed Company Website. We hope the information found on this page is useful and relevant to what you are looking for. If you have any questions about our company or or storage sheds, please feel free to call us.
Apex Shed Company Home Page | Storage Shed Prices | Storage Shed Styles | Do-it-Yourself Shed Kits
Apex Play Houses | Options & Accessories | Custom Storage Sheds | About Us / Our Story | Shed Building Permit Requirements
© Copyright Apex Shed Company Inc. 2016